          Design and dimensioning according to F.E.M.

          Gantry crane beams built in coffin or profile according to span and nominal load.

          Gantry crane legs built in coffin or profile according to span and nominal load.

          Maximum permissible deflection of 1/1000.

          Surface Treatment: The entire metal structure is shot blasted in MARCOVIL Automatic

           Shot Blasting Machine to grade SA 2,5, with painting scheme according to the

           surrounding environment.

          Lifting movement with two speeds.

          Direction movement with inverter speed.

          Translation movement with inverter speed.

          Hook (DIN 15400) with 360º manual rotation.

          Protection class IP55 for the electric motors.

          Protection class IP65 for the crane’s electric cabinet.

          Pendant control with plug connection and with independent movement.

          Vertical staircases and maintenance walkway throughout the gantry crane span.


          Runway.

          Steel structure to support the runway.

          Electric power supply for the gantry crane translation:

                    By cable reel.

                    By electric generator group.

                    By enclosed conductor system in PVC, Aluminum or Stainless steel.


Main Peripherals

The overhead cranes are composed of two main beams supported at the extremities by the end carriages that execute the translation movement of the crane. The hoist; lifting and direction movement; works on top of the two main beams. It should also be noted that more than one hoist can work on the same overhead crane, working simultaneously with the main hoist or performing an auxiliary function.

The overhead cranes are composed by a main beam supported at the extremities by the end carriages that execute the translation movement of the crane. The hoist; lifting and direction movement; works under the main beam. It should also be noted that more than one hoist can work on the same overhead crane, working simultaneously with the main hoist, or performing an auxiliary function.



Capacity

Max. Span (Meters)

Capacity

Max. Span (Meters)

Up to 12,5 tons

26

Configuration

Construction

(placeholder)
(placeholder)

Optional Features

(placeholder)

Safety Features

(placeholder)

Up to 40 tons

40 to 50 tons

40

33

50 to 100 tons

100 to 200 tons

30

25

Up to 5 tons

30

          Load Limiter.

          Lift limit switch

          Direction limit switch.

          Translation limit switch.

          Detection sensors assembled to the crane’s legs to detect persons or objects along the

            runway.

          Acoustic and luminous warning signal.

          Emergency stop button on the pendant control and on the radio remote control.

          Pictograms.

          General external cut in the crane electrical cabinet.


          Radio remote control.

          Electronic weighing system.

          Inverter speed for the lifting movement.

          Gantry crane handling tools.

          Electronic anti-balancing load system.

          Hook rotation locking mechanism.

          Control cabin with manual / semi-automatic / automatic control system.

          Flanged coffin beams for containerized transport.

          Lighting.

          Hoist cover.

          Stainless steel electric cabinet.

          Protection IP65 for electric motors.